12 pictures
Condo
·
for sale
USD 374,990
USD 189/sq.ft
154 Kimble Creek Loop
Post Oak, Kyle city Kyle-Buda CCD Hays County Texas
· 1,981 sq.ft · 4 Bedrooms · 3 Baths · Condo
· Garden · Office room · Equipped kitchen
Post Oak, Kyle city Kyle-Buda CCD Hays County Texas · 1,981 sq.ft · 4 Bedrooms · 3 Baths · Condo · Garden · Office room · Equipped kitchen
Beautifully maintained Highland Home in 6 Creeks, offering like-new condition, thoughtful upgrades, and a quiet, low-traffic location within the community. Appliances negotiable with strong offer. The kitchen is both stylish and practical, showcasing upgraded pendant lighting and a farmhouse-style sink, flowing seamlessly into the main living area. Additional upgrades include USB outlets in every bedroom, in-wall conduit for easy TV mounting in the living room and two bedrooms, and a floor outlet for clean, hidden wiring. The layout features a privately positioned bedroom next to a full bath, creating a flexible space for guests, a home office, or multigenerational living. Enjoy the outdoors with a greenbelt backdrop, along with a gas stub in the backyard ready for grilling or future outdoor enhancements. Inside, you’ll also find gas and electric connections for the dryer, upgraded carpet with premium padding in excellent condition, full irrigation, and gutters already installed. Locat
Beautifully maintained Highland Home in 6 Creeks, offering like-new condition, thoughtful upgrades, and a quiet, low-traffic location within the community. Appliances negotiable with strong offer. The kitchen is both stylish and practical, showcasing upgraded pendant lighting and a farmhouse-style sink, flowing seamlessly into the main living area. Additional upgrades include USB outlets in every bedroom, in-wall conduit for easy TV mounting in the living room and two bedrooms, and a floor outlet for clean, hidden wiring. The layout features a privately positioned bedroom next to a full bath, creating a flexible space for guests, a home office, or multigenerational living. Enjoy the outdoors with a greenbelt backdrop, along with a gas stub in the backyard ready for grilling or future outdoor enhancements. Inside, you’ll also find gas and electric connections for the dryer, upgraded carpet with premium padding in excellent condition, full irrigation, and gutters already installed. Locat
USD 374,990