View photo
House
·
for sale
USD 285,000
USD 319/sq.ft
233 Centre Street
Penndel
· 893 sq.ft · 2 Bedrooms · 1 Bath · House
· Patio · Equipped kitchen · Air conditioning
Penndel · 893 sq.ft · 2 Bedrooms · 1 Bath · House · Patio · Equipped kitchen · Air conditioning
Located in desirable Neshaminy School District on a quiet street but within close proximity to many commuter routes including I-95, I-295, Route 1, and the PA Turnpike, this adorable home awaits its new owners! Perfect for first-time home buyers, downsizers, or anyone looking for one-floor living, 233 Centre St is sure to please. Almost unheard of LOW taxes of $2,544 for 2026. Wow! This home features a spacious living room which flows seamlessly into your fully outfitted kitchen and dining area, with two well-sized bedrooms at the back of the house along with a large full bathroom with tub shower in the hallway. The ample sized laundry room completes the floorplan, with direct access outside to your private patio space. Upgrades include installation of central air (brand new in 2024), back portion of the roof and soffits replaced (April 2023), front steps replastered and landing resurfaced (May 2026), front concrete sidewalk fully replaced (May 2026), new sump pump and garbage disposal
Located in desirable Neshaminy School District on a quiet street but within close proximity to many commuter routes including I-95, I-295, Route 1, and the PA Turnpike, this adorable home awaits its new owners! Perfect for first-time home buyers, downsizers, or anyone looking for one-floor living, 233 Centre St is sure to please. Almost unheard of LOW taxes of $2,544 for 2026. Wow! This home features a spacious living room which flows seamlessly into your fully outfitted kitchen and dining area, with two well-sized bedrooms at the back of the house along with a large full bathroom with tub shower in the hallway. The ample sized laundry room completes the floorplan, with direct access outside to your private patio space. Upgrades include installation of central air (brand new in 2024), back portion of the roof and soffits replaced (April 2023), front steps replastered and landing resurfaced (May 2026), front concrete sidewalk fully replaced (May 2026), new sump pump and garbage disposal
USD 285,000